DSA Launch Procedure

Polling Stations

Each launch controller should give a “go” or “no-go” for launch. Upon giving the “go,” the corresponding hold switch should be moved to the down and off position. The red light above the switch will extinguish.

Controller
AbbrTitle
CGLSGround launch sequencer engineer
SROSuperintendant of range operations
LRDLanding and recovery director
SAFETYSafety console coordinator
TBCTank/booster test conductor
CTCCapsule test conductor
LPSLaunch processing system coordinator
LDLaunch director

If all flight controllers are “go” and no red lights are visible above the controller desks, then the Launch Director should

  1. Provide a pre-count to initiate the countdown on his/her “mark.”
  2. Press the green “GO” button to initiate the countdown.

Countdown Events

When reading the countdown aloud, read entries as lights are extinguished. For example, read entry #14 immediately after the first lamp is extinguished.

Lamps Lit T± (MM:SS)Event
15 T- 01:50Countdown initiated
14 T- 01:43Ground launch sequence start
13 T- 01:36
12 T- 01:29
11 T- 01:22
10 T- 01:15Main engine gimbal test
9 T- 01:08
8 T- 01:01
7 T- 00:54Internal power transfer
6 T- 00:47
5 T- 00:40
4 T- 00:33Auto-sequence start
3 T- 00:26
2 T- 00:19Main engine start
1 T- 00:12
0 T- 00:05Launch commit
T+ 00:00Lift-off

If an ABORT is desired after main engine start, the countdown must be re-started from T- 01:50.