DSA Launch Procedure

Many individuals contribute to the safe and successful launch of DSA Spacecraft. The official job titles and descriptions of each participant are listed below.

Station
AbbrTitle
CGLSGround launch sequencer engineer
SROSuperintendant of range operations
LRDLanding and recovery director
SAFETYSafety console coordinator
TBCTank/booster test conductor
CTCCapsule test conductor
LPSLaunch processing system coordinator
LDLaunch director
MINERVASpacecraft pilot

Polling Stations

During polling, each launch controller should give a “go” or “no-go” for launch. Upon giving the “go,” the corresponding hold switch should be moved to the down-and-off position. The red light above the switch will extinguish. If the controller is not physically present in the control room—i.e., they are occupied elsewhere—then an adjacent controller will operate the lever.

The LD shall poll the following stations, in order:

  1. MINERVA
  2. CGLS
  3. SRO
  4. LRD
  5. SAFETY
  6. TBC
  7. CTC
  8. LPS
  9. LD

If all flight controllers are “go” and no red lights are visible above the controller desks, then LD should request that CGLS commence the countdown. CGLS will then:

  1. Provide a pre-count to initiate the countdown on his/her “mark.”
  2. Press the green “GO” button to initiate the countdown.
  3. Read the countdown events listed in the section below, as they occur.

Countdown Events

CGLS should read the countdown aloud. When reading the countdown, read the times and milestones from the following table. Both should be read as lights are extinguished. For example, read entry for “Ground launch sequence start” immediately after the first lamp is extinguished.

Lamps Lit T± (MM:SS)Milestone
15 T- 01:50Countdown initiated
14 T- 01:43Ground launch sequence start
13 T- 01:36
12 T- 01:29
11 T- 01:22
10 T- 01:15Main engine gimbal test
9 T- 01:08
8 T- 01:01
7 T- 00:54Internal power transfer
6 T- 00:47
5 T- 00:40
4 T- 00:33Auto-sequence start
3 T- 00:26
2 T- 00:19Main engine start
1 T- 00:12
0 T- 00:05Launch commit
T+ 00:00TNT Ignition
T+ 00:04Lift-off

At any time prior to main engine start, at T- 00:19 seconds, any controller may request that the countdown be held by

  1. saying “HOLD COUNTDOWN;” and
  2. moving their countdown hold switch to the up-and-on position.

CGLS should acknowledge that the countdown has been held.

After main engine start, all holds will be considered a mission ABORT. To re-start from an abort condition, the master power must be cycled off, then back on again, and the full countdown must be started from the top (i.e., T- 01:50).

After launch commit, no abort is possible, and the flight must continue.

In the event of a hold or abort, MINERVA should rotate the Pilot's Arm Switch to the down-and-off position. This action will inhibit and prevent TNT ignition, but it will not hold the countdown. In the event that MINERVA requests a countdown hold, CGLS is responsible for holding the countdown.